Burleson County Fiber Construction

What to Expect in Your Neighborhood

Report a problem

If something doesn’t look right or you have a concern about your property, please let us know so we can address it quickly.

Now Building

Expanding Fiber Infrastructure in

Central Texas

Nexstream is expanding our underground fiber network to serve more homes and businesses throughout the region.

Where We Build
Fiber infrastructure is installed primarily within public Right of Way and recorded utility easements. Construction progresses through neighborhoods in planned phases.
How We Build
We build and maintain our own network using trained, in-house construction teams. Our process is designed to minimize disruption and restore areas promptly once work is complete.
Now Building

Expanding Fiber Infrastructure in

Central Texas

Nexstream is expanding our underground fiber network to serve more homes and businesses throughout the region.

Where We Build
Where We Build
Fiber infrastructure is installed primarily within public Right of Way and recorded utility easements. Construction progresses through neighborhoods in planned phases.
How We Build
How We Build
We build and maintain our own network using trained, in-house construction teams. Our process is designed to minimize disruption and restore areas promptly once work is complete.
The Build

Construction at a Glance

Construction moves through neighborhoods in planned phases. While each project timeline varies, most homes only experience active work nearby for a few days at a time.

18–36 inches is the typical burial depth of underground fiber.
Crews are typically active near a single property for 1–3 days.
Public utilities are professionally located and marked before excavation.
Nexstream Hill Country Internet
Nexstream Hill Country Internet
Installation Depth

Project timelines vary by neighborhood size and permitting.

Construction Methods

Directional boring or trenching is used based on site conditions.

Restoration Timeline

1–5 days is the typical restoration timeframe after installation.

Image link

Where Construction Occurs

Most fiber construction takes place within public Right of Way and recorded utility easements, with occasional work near property lines, driveways, or street crossings. Our crews work carefully and maintain clear communication throughout the process.

Typical construction locations include:

Road shoulders
Ditch lines
Areas adjacent to curbs
Recorded utility easements
Driveway or side street crossings
What to Expect

How Long Will Construction Be Near My Property?

Construction near your property is temporary and planned. Here’s what you can expect during active work.

What You May Notice
Temporary utility markings, small bore pits, construction equipment, or occasional lane adjustments. These are part of the underground process and are addressed as work progresses.
At Your Property
Most homes experience active construction directly in front of the property for only a few days before crews move on.
In Your Neighborhood
Construction moves through neighborhoods in planned segments. Overall work may span several weeks depending on size and permitting.
What to Expect

How Long Will Construction Be Near My Property?

Construction near your property is temporary and planned. Here’s what you can expect during active work.

What You May Notice
Temporary utility markings, small bore pits, construction equipment, or occasional lane adjustments. These are part of the underground process and are addressed as work progresses.
At Your Property
Most homes experience active construction directly in front of the property for only a few days before crews move on.
In Your Neighborhood
Construction moves through neighborhoods in planned segments. Overall work may span several weeks depending on size and permitting.

Our Underground Fiber Construction Process

Fiber construction is completed in clear, planned stages. Each step ensures the network is built safely, efficiently, and ready to serve your community.

1. Engineering & Permitting
Fiber routes are planned, engineered, and approved before construction begins
2. Utility Locating
Public utilities are located and marked (811) before any excavation to ensure safe underground fiber installation
3. Underground Installation
Conduit for the fiber network is installed underground using directional boring or trenching, depending on site conditions
4. Fiber Installation & Splicing
Fiber optic cable is placed within the conduit and carefully spliced to connect each segment to the larger fiber network
5. Testing & Activation
The fiber system is tested to ensure it performs reliably and is ready to serve homes and businesses
6. When Homes Connect: Service Drops
Individual fiber service drops are installed when residents request Internet service, connecting the home directly to the underground fiber network

Our Underground Fiber Construction Process

Fiber construction is completed in clear, planned stages. Each step ensures the network is built safely, efficiently, and ready to serve your community.

1. Engineering & Permitting
Fiber routes are planned, engineered, and approved before construction begins
Nexstream Hill Country Internet
3. Underground Installation
Conduit for the fiber network is installed underground using directional boring or trenching, depending on site conditions
Nexstream Hill Country Internet
5. Testing & Activation
The fiber system is tested to ensure it performs reliably and is ready to serve homes and businesses
Nexstream Hill Country Internet
Nexstream Hill Country Internet
2. Utility Locating
Public utilities are located and marked (811) before any excavation to ensure safe underground fiber installation
Nexstream Hill Country Internet
4. Fiber Installation & Splicing
Fiber optic cable is placed within the conduit and carefully spliced to connect each segment to the larger fiber network
Nexstream Hill Country Internet
6. When Homes Connect: Service Drops
Individual fiber service drops are installed when residents request Internet service, connecting the home directly to the underground fiber network
Property Protection

Protecting Your Property During Construction


We take property protection seriously. Here’s what our crews handle during construction and what homeowners should identify before work begins.

How We Protect Your Property

Our goal is clear: leave your property looking like it did when we arrived. We focus on minimizing disruption while work is completed.

  • Public utilities are located and clearly marked.
  • Routes are planned to minimize surface disturbance.
  • Underground installation methods are used whenever possible to reduce surface impact.
  • Work areas are kept as small as possible.
What Homeowners Should Identify

Homeowners should clearly mark any private utilities within easement areas before service drop installation to help prevent accidental damage, including:

  • Irrigation systems
  • Invisible dog fences
  • Landscape lighting
  • Private electrical lines
  • Outdoor water features
Restoration

Restoring Your Property After Construction

Image link

We install underground fiber using directional boring or trenching, depending on site conditions. These methods help minimize surface disruption during construction.

After installation, our focus is on restoring affected areas as work progresses.

Soil is replaced and compacted.
Disturbed areas are graded and leveled
Grass seed or sod is applied as needed
Gravel and pavement areas are restored
Restoration

Restoring Your Property After Construction

We install underground fiber using directional boring or trenching, depending on site conditions. These methods help minimize surface disruption during construction.

After installation, our focus is on restoring affected areas as work progresses.

Soil is replaced and compacted.
Disturbed areas are graded and leveled
Grass seed or sod is applied as needed
Gravel and pavement areas are restored
Image link
FAQ

Frequently Asked Questions

FAQ

Frequently Asked Questions

How long does fiber construction take?
Neighborhood construction typically takes several weeks, depending on size and permitting. Crews move in phases, completing one section at a time before moving forward.
Are you allowed to work in front of my property?
Yes. Most of our construction takes place within public Right of Way or recorded utility easements, which are designated areas where utilities are permitted to install and maintain infrastructure.
Will my driveway be cut?
In most cases, driveways are not cut. When crossing a driveway or roadway is required, we typically use underground boring methods to avoid surface disruption. In rare cases where cutting is necessary, it is restored after installation.
Why did crews leave before finishing?
Fiber construction is completed in phases. Crews may move to another section while permitting, inspections, or additional work is completed in the previous area. This is a normal part of the process.
What happens if something is damaged?
If something appears damaged during construction, please contact us. Our team reviews concerns promptly and works to address issues as quickly and thoroughly as possible.
When can I sign up for fiber Internet service?
Service availability depends on construction progress. Once your area is ready, you’ll be able to check availability and request installation through your community page.
How long will crews be working in front of my home?
Most homes see active construction directly in front of the property for a short period of time before crews move on. While the overall project may take weeks, activity at any single location is usually limited.
Why is there paint and flags in my yard?
Colored paint and flags mark underground utilities before digging begins. Each color represents a different utility type and helps ensure safe installation. These markings are temporary.
What is a bore pit?
A bore pit is a small access hole used during underground installation. It allows crews to safely install conduit beneath the surface. Bore pits are temporary and are restored once installation is complete.
When will my lawn be restored?
Restoration typically follows shortly after installation in that area. Soil is replaced and leveled, and disturbed grass areas are reseeded or repaired as needed.
Do I need to be home during construction?
No. Mainline fiber construction does not require access inside your home. If you request service, an appointment will be scheduled for your individual connection.
What if I don’t want service — will work still occur?
Yes. Mainline fiber installation serves the entire neighborhood and occurs regardless of individual signups. You are not required to subscribe to service.